Over the least week or so I’ve been chipping away at getting more flooring down, up in the loft, so we can store more stuff up there.
I did a load of work like this about four or five years back. But that floor space quickly grew to be full to o’erflowing! I think the area I originally floored was about 60 sq. feet? Minus the access hatch.
The two areas I’m adding, one either side, are about 40 sq. feet each. So we’ll have about 140 sq. feet when I’m done. I did the western side already. And that’s already getting full!
I need to shift a ton of stuff, quite possibly literally, to get the eastern side clear and ready to be laid. It’s grim work up in the loft; there’s about 140 years worth of soot and dust and dirt up there!
When I did the first tranche of work I substituted the fibreglass type insulation for foam boards. I don’t know if that was worth while or not? But fir the remainder I’m recycling the insulation that was there already.
That said, I’ve been getting rid of the oldest (lowest/dirtiest) layers, bagging them up and taking the hideously dusty and dirty stuff to the local dump. I need to run some wiring / lighting and power – up there.