I sincerely hope that by the end of three weeks worth of work on this, it’ll be done!? I just need to paint the internal door faces, and hang these two doors.
A little Health & Wellbeing footnote: I had two pints of beer/lager (Moretti), at the fireworks last night. This morning I feel fairly shite. Quite depressed. Is that a result of the drinks?
Rather annoyingly, the doors on this model don’t really work as intended. But never mind. Maybe if I ever do another similar project, I might do the doors better?
So, here are a few views with the roof on. I guess the model is, essentially, finished now? I could add interior detail – plan chest, easels, shelves, etc. But I think that’ll be something I’ll return to later (if at all?).
I’ve got a little painting to do: the brick foundation, concrete slab, etc. And I might add guttering. But the model is, for now, ‘completed’. Time to move on to something else.
This final snap is taken through one of the east face windows. And I like it! It’s nice to be able to visualise the interior.
I’m tempted to make claymation style Seb & Teresa figures, to go inside…